Transneft Siberia has obtained an approval from the Russian General Board of State Expert Review on the design documentation of the Surgut-Polotsk pipeline reconstruction.
The project stipulates for the replacement of a 20km line section of the Surgut-Polotsk main with a calibre at 1200 mm and further connection of the section to the operating pipeline. The Surgut-Polotsk main is the oil pipeline connecting Russia’s Western Siberia to Belarus. The Siberian oil is transferred to Belarus via the pipeline and […]